Projects

Project Details

Project Name: Turnkey Textile Dyeing and Finishing WWTP Design and Construction
Country: Honduras
Description: Turnkey engineering and construction services were provided for a 3.75 mgd wastewater treatment facility located in Honduras. The discharge contained wastewater from cotton and cotton/poly blended fabic dyeing and finishing operations as well as sanitary discharges from the facility. The system provided extended aeration biological treatment and utilized ozonation for color removal. On-site oxygen generation was provided. Design, construction, start-up, and training services were provided, including Operations and Maintenance Manual.
 

 [ Home | Who We Are | What We Offer | Projects | Contact Us | Site Privacy Policy ]

AT&E, P. C.

545 Panorama Road

Earlysville, VA 22936

ph: 434-249-6443

©copyright 2001-2020 AT&E, P. C.
- All Rights Reserved