Project Name:
|
Prepared Stormwater Pollution Prevention Plan
|
Country:
|
USA
|
Description:
|
The client has a food processing and preparation facility in Virginia. The facility is subject to regulations for storm water discharges associated with industrial activity. The client's personnel filed the required notice of intent (NOI). In compliance with the requirements of the general permit, a Stormwater Pollution Prevention Plan (SWP3) was prepared that included PE certification of measures associated with SARA section 313 materials potentially exposed to stormwater.
|
|