Projects

Project Details

Project Name: Preliminary Engineering Report for the Upgrade of Textile Dyeing and Finishing WWTP
Country: None Listed
Description: A detailed evaluation of the client's textile dyeing and finishing wastewater treatment plant was performed to determine current and projected operating limitations. Based on this evaluation, a preliminary engineering report was developed detailing facility upgrade requirements. Fundamental in this evaluation was the development of short and long term production projections and estimates of the impact on wastewater treatment facilities. Areas of concern included: flow equalization, clarification capacity and solids handling capacity. Recommendations were provided for phased improvements to allow increases in flow and organic loading in a stepwise fashion.
 

 [ Home | Who We Are | What We Offer | Projects | Contact Us | Site Privacy Policy ]

AT&E, P. C.

545 Panorama Road

Earlysville, VA 22936

ph: 434-249-6443

©copyright 2001-2020 AT&E, P. C.
- All Rights Reserved